Ports description
Ports Situation
Oil Terminals
Ports arrival check-list Inland Transport
Newsletters Contacts
 

WEBSITE IS UNDER MAINTENANCE. CONTACTS AND PORT SITUATION ARE NOT UPDATED. DO NOT HESITATE TO CONTACT AFRITRAMP@BOLLORE.COM FOR INFORMATION


31-32 quai de Dion-Bouton
92811 Puteaux Cedex
Phone: (33) 1 46 96 42 84
Fax:     (33) 1 46 96 40 96
Mail : afritramp@bollore.com
 
 
31-32 quai de Dion-Bouton
92811 Puteaux Cedex
Phone : (33) 1 46 96 42 84
Fax : (33) 1 46 96 40 96

Mail : afritramp@bollore.com
Ports description
 
 
Gabon  

>> Libreville-Owendo map port>> Libreville-Owendo port facilities>> Port Gentil map port>> Port Gentil port facilities

Libreville-Owendo map port

Map reference number and Description Length (m) Draught (m)
1 All cargo 250 9.00 to 10.5
3 All cargo 180 7.5 to  8.5, depends on the dredging campaign (every 6 weeks)
Private Comilog Jetty Manganese ore 200 11.8 SW*
4 Oil Terminal Max LOA 120 m 8 meters along the jetty

Commercial berths :
P1 : Max LOA : 250 m / P3 : 180 m
Dredging operations are performed periodically. Every 6 weeks in average. Draft situation is unstable. Ttidal port silting with mud. 

Gabon_drafts Owendo on 261115 


All berths :
No beam restriction
Draught is calculated on level 0 / Water density : 1.015/1.018.
ISPS : Level 1
Weather : Rainy season from October to May.Heavy rain falls with strong winds.  Tornadoes in February and March.
Channel : length : 12 miles; width : 1 to 4 miles, max depth : 30 to 32 ft.
Tides : high water : 2.20m; low water : 0.20 m ; tidal range : 2.00 m.
Berthing / commercial quay : no Yokohama fending.

Comilog :
Max air restriction : 19 meters from sea level.
Total mooring lines : 18 (min required for berthing - Comilog rules / rent possible).
Loading rate : 10.000 M/T per WWD- Shinc - Mean of loading : shore conveyor belt.
Private stevedoring.

Click ton enlarge

Click to enlarge   Click to enlarge   Click to enlarge 

Click to enlarge  Click to enlarge 




Top of page

Libreville-Owendo port facilities

>> Storage facilities

Bonded warehouses 2,000 sqm
Container storage area 112,000 sqm
General cargo storage yard 5,000 sqm
Plugs for reefer containers 174
Free storage zone for cargo in transit to Owendo open storage 65,000 sqm
Owendo covered 14,600 sqm

>> Stevedoring equipement

  Quantity Capacity
Mobile Crane 3 (2 for Container vessels and 1 for General Cargo) 100 T
Super staker 10 28 - 45 T
Forklift 19 2.5 - 13 T
Trailer 80 20' & 40'

>> Other facilities

  Yes/No
Bunkering Yes (by international nomination and by truck no barging) : DO only
Water Yes (at commercial quay only / no barging)
Slops No
Shipchandler Yes
Shipyard No


Port Gentil map port

Map reference number and Description Length (m) Draught (m)
1

Quay de commerce all cargo

420 10
2 Lighterage quay 75 2-3

Cap Lopez, Gamba, Lucina, Etame, Oguendjo are operated by Port Gentil.
Quay de commerce : berthing/sailing after 11:00 pm under Port and Pilot appreciation.
Water density : 1.027 / 
ISPS : Level 1


Weather : Rainy season from October to May. Tornadoes in February and March.
Private stevedoring.

Port Gentil port facilities

>> Storage facilities

Bonded warehouses 7,000 sqm
Container storage area 7,000 sqm
General cargo storage yard 10,000 sqm
Plugs for reefer containers 18
Paved stacking area 1,200 sqm

>> Stevedoring equipment

  Quantity Capacity
Super stakers 2 42 T
Forklifts 5 4 T - 7 T
Trailer 10 40 T
Tug master & mafi 1 20 T

>> Other facilities

  Yes/No
Bunkering Yes
Water Yes
Slops No
Shipchandler Yes
Shipyard Yes


SEE :

Contacts General country characteristics


Le contenu de cette page nécessite une version plus récente d’Adobe Flash Player.

Obtenir le lecteur Adobe Flash











          © 2016 Bolloré Group,